A three-bedroom 1890s terrace rewired in seven working days, with the original cornicing and floorboards kept intact.
Area
Ellesmoor
Job type
Full rewire
Status
Case study

The job
The brief
The owners had just bought the house and their survey flagged rubber-insulated cables and a 1970s fuse box. They wanted everything replaced before decorating, without losing the period features they’d fallen in love with.
The work
We lifted boards in a numbered sequence, ran new circuits under the floors and fished cables behind the plaster to avoid chasing into the original cornicing. A new consumer unit went into the understairs cupboard with RCBO protection on every circuit.
The result
Seven working days from start to certificate. The family moved in a week later, and the decorators started on a clean, fully certified installation.
More projects
Other jobs from across Calder Vale.

Ashwick Down
Garden room power and lighting
An armoured supply to a new garden office, with sockets, data, heating and soft exterior lighting along the path.

Calderby
Twin EV chargers for a two-car household
Two smart chargers on a shared supply, with load management so both cars charge overnight without tripping the main fuse.
Planning similar work?
Send a few photos and a short description. We will come back with a fixed price in writing.