Two smart chargers on a shared supply, with load management so both cars charge overnight without tripping the main fuse.
Area
Calderby
Job type
EV chargers
Status
Case study

The job
The brief
The couple had just swapped both their cars for electric models and wanted to charge them overnight, on a 60A supply that also runs a heat pump.
The work
After a supply check we fitted two 7kW smart chargers with a shared CT clamp. The chargers talk to each other and throttle back when the house load is high.
The result
Both cars are fully charged by 7am on the cheapest overnight tariff, and the main fuse has never come close to its limit.
More projects
Other jobs from across Calder Vale.

Ashwick Down
Garden room power and lighting
An armoured supply to a new garden office, with sockets, data, heating and soft exterior lighting along the path.

Brackenford
Consumer unit upgrade in a 1930s semi
A wooden-backed fuse box with rewireable fuses replaced by a modern metal consumer unit in a single day.
Planning similar work?
Send a few photos and a short description. We will come back with a fixed price in writing.