An armoured supply to a new garden office, with sockets, data, heating and soft exterior lighting along the path.
Area
Ashwick Down
Job type
Garden room supply
Status
Case study

The job
The brief
The homeowners had a timber garden room built as a home office and needed it powered safely, with lighting so the path was usable on winter evenings.
The work
We ran an armoured cable in a trench to a small consumer unit in the garden room, then fitted sockets, a panel heater circuit, data points and low-level IP-rated path lights.
The result
The office has been in daily use since September, and the path lights switch on automatically at dusk.
More projects
Other jobs from across Calder Vale.

Calderby
Twin EV chargers for a two-car household
Two smart chargers on a shared supply, with load management so both cars charge overnight without tripping the main fuse.

Brackenford
Consumer unit upgrade in a 1930s semi
A wooden-backed fuse box with rewireable fuses replaced by a modern metal consumer unit in a single day.
Planning similar work?
Send a few photos and a short description. We will come back with a fixed price in writing.